Section 6 - Improvement Projects

6.1 Introduction

Section 6 consists of projects generated from the recommendations presented in the visual zone analysis sections starting of each Visual Zone.  The projects may consist of enhancement of a single visual element or improvement of an area that includes a variety of visual elements. Depending on the project scope and cost, the projects could include:  Military construction (MILCON), Host Nation programs, Non-appropriated/funded (NAF), Other Procurement, Army (OPA) and maintenance and repair, local minor construction, and self-help.  Each improvement project is described and cost-estimated in enough detail to place each project within the appropriate project list or annual work plan, in an appropriate Fiscal Year, within the statutorily correct funding program. Projects require a Capital Investment Strategy.   

The paragraphs below discuss each project at length and includes existing conditions, project description, design concept, cost estimate, primary and alternate recommended funding sources, photographs, sketches and maintenance impact as applicable.

Appendix G of this Installation Design Guide, the Prioritized Improvement Projects List, records information on each project and prioritizes them in accordance with the installation goals and objectives stated in Section 3.2, Goals, Objectives and Recommendations.  The appendix is an interactive form and designed to be altered as circumstances effecting the prioritization scheme change.

All projects done on the installation shall follow the Engineering Support and all other project requirements found in Appendix B of this document.

 

Print Section 6
 

Installation Design Guide