B.3.6 Landscaping

For all new landscaping, or changes to existing it is the intent of Command that the landscape design conform with the look of the rest of the Post. (See Section 10 of the IDG.) All landscaping entails the need for a DA Form 4283 (Facility Engineering Work Request) to be submitted to the DPW for approval and in most cases there is also the need for a Dig Permit, FC Form 86. 

NOTE:  Offerers will provide a Landscaping Plan for the project area as required in the RFP.  Surface area disturbance and tree removal will be minimized.  Trees to be retained will be incorporated in the Landscaping Plan.  Landscaping shall refer to the planting of trees, shrubs, plants, etc. and shall not be associated with establishment of turf as defined below.  Trees, shrubs, plants, etc. shall be guaranteed for a period of one (1) year from time of planting.

Soil Poisoning for termite protection is required?

NOTE:  It will be the Contractor's responsibility to protect all existing turf and landscaping affected by the construction and to replace any turf or landscaping that has been damaged, for the term of the contract.

 

 
 

B.3 PROJECT DESIGN