Appendix A
- Design Team IDG Checklist
Appendix B
- Project Requirements Checklist
B.2 Project Preperation
B.2.1 Drawing/Information Procurement
B.3 Project Design
B.3.1 Hydrology Design Guidance
B.3.2 Foundation Information
B.3.3 Engineering Support
B.3.4 Exterior Electrical Distribution & Installation Design Guide
B.3.5 Wetland Management
B.3.6 Landscaping
B.3.6.1 Agronomy Design Guidelines
B.3.6.1.1 Basic Planting Guide
B.3.6.1.2 Seeding Cantonment Area
B.3.6.1.3 Sod
B.3.6.1.4 Staple Pattern Guide
B.3.6.1.5 Tree and Shrub Pruning
B.3.6.1.6 Turfgrass Irrigated
B.3.6.1.7 Tree and Shrub Watering Guide
B.3.6.1.8 Downrange Seeding Specifications
B.3.7 Paving Requirements
B.3.8 Pavement Painting, Yellow and White
B.3.9 Security Requirements
B.3.10 Exterior Signage Requirements
B.3.11 Underground Utilities
B.3.12 Exterior Lighting
B.3.13 Water Service
B.3.14 Sanitary Sewer Service
B.3.15 Gas Service
B.3.16 Antennas and Support Structures
B.3.17 Energy Conservation
B.3.18 Electrical Requirements
B.3.19 Mechanical/Plumbing Requirements
B.3.19.1 Mechanical Equipment
B.3.19.2 Plumbing
B.3.20 Air Conditioning Design Data
B.3.21 Restroom Requirements
B.3.22 Fire Protection Requirements
B.3.23 Communications requirements
B.3.23.1 Outside Plant
B.3.23.2 Inside Plant
B.3.23.3 Cable
B.3.24 Fort Carson Fire Department Standards
B.3.24.1 Addressing
B.3.25 Insulation Requirements
B.3.26 Solar Applications
B.3.27 LID Site Planning Process
B.3.28 Army Standards for Construction
B.3.29 Local Construction Codes and Standards
B.3.30 Mass Notification Guide
B.4 Project Closeout
B.5 Construction
B.5.1 Construction Start-up
B.5.2 Air Quality Management Program
B.5.2.1 Demolition and Renovation
B.5.2.2 Land Development Notice
B.5.2.3 Facility Upgrades
B.5.2.4 Open Burning
B.5.2.5 Sand Blasting
B.5.2.6 Ozone Depleting Chemicals
B.5.2.7 Painting
B.5.2.8 General Conformity
B.5.3 Contaminates
B.5.4 Solid Waste Management
B.5.5 Dig Permits
B.5.6 Asbestos/Lead Base Paint Management Program
B.5.7 Energy Conservation
B.5.8 Pollution Prevention
B.5.9 Radon
B.5.10 Summary of Permits
B.5.11 Storm Water Retention Basins
B.5.12 Noxious Weeds
B.5.13 Utility Activation
B.5.14 Construction Permit
B.5.15 Permit Extensions
B.5.16 Utility Permits
B.5.17 Water Quality Management Program
B.5.18 Utility Service Requirements, Locates
B.5.19 Noise
B.5.20 Demolition
B.5.21 Hazardous Materials
B.5.22 Coordination and Notification Required for Railroad Track Work
B.5.23 Safety
B.5.24 Utility Meters
B.6 Maintenance
B.7 Requests
B.7.1 New Signage
B.7.2 Canopies
B.8 General Base Wide Information
B.8.1 Wildlife
B.8.2 Solid Waste Management
B.8.3 Wetland Management
B.9 Check List
Appendix C
- Interior Design Review Checklist
Appendix D
- Sustainable Design
D.1 What is Sustainable Design?
D.2 Sustainable Design and Development
D.3 Sustainability and the Federal Government
D.4 USGBC LEED
D.5 Army Standards
D.6 The Building Architectural Design
D.6.1 Schematic Design
D.6.1.1 Siting the Building for Solar Accessibility
D.6.1.2 Building Massing and Orientation
D.6.2 Designing Using Computer Simulations
D.6.3 Designing High Performance Features and Systems
D.6.3.1 Solar Shading
D.6.3.2 Shading Strategies
D.6.3.3 Glazing Selection
D.6.3.4 Guidelines for Good Window Design
D.6.3.5 Glazing Properties
D.6.4 Designing for Daylighting
D.6.4.1 Window Design Considerations
D.6.4.2 Effective Aperture
D.6.4.3 Light Shelves
D.6.4.4 Toplighting Strategies
D.6.4.5 Daylighting Integration Issues
D.6.4.6 Daylighting Resources
D.6.5 Passive and Active Solar Systems
D.6.5.1 Thermal Storage
D.6.5.2 Trombe Wall
D.6.5.3 Passive Cooling
D.6.5.4 Natural Ventilation
D.6.5.5 Evaporative Cooling
D.6.5.6 Passive Solar Heating Strategies
D.6.5.7 Active Solar Heating Systems
D.6.5.8 Transpired Solar Collector
D.6.5.9 Solar-Electric Systems
D.6.6 Accommodating Recycling Activities
D.6.7 Incentives for Renewable Technologies and Sustainable Design
D.7 Lighting, HVAC, and Plumbing
D.7.1 High Performance Engineering Design
D.7.1.1 Lighting System Design
D.7.1.2 HVAC System Design
D.7.2 Lighting System Design
D.7.2.1 Ambient Lighting
D.7.2.1.1 HID Lighting
D.7.2.1.2 Fluorescent Lighting
D.7.2.2 Task Lighting
D.7.2.3 Accent Lighting
D.7.2.4 Safety Lighting
D.7.2.5 Lighting Controls
D.7.2.6 Steps for Effective Lighting System Design
D.7.3 Mechanical System Design
D.7.3.1 HVAC System Zones
D.7.3.1.1 Perimeter Zones
D.7.3.1.2 Interior Zones
D.7.3.1.3 Ventilation Systems for Zones
D.7.3.2 HVAC System Selection
D.7.3.2.1 VAV Systems
D.7.3.2.2 Air-Handling Units (AHU)
D.7.3.2.3 Air Distribution Systems
D.7.3.2.3.1 Under-Floor Air Distribution Systems
D.7.3.2.4 Free Cooling Systems
D.7.3.2.5 Evaporative Cooling Systems
D.7.3.2.6 Ventilation and Exhaust Systems
D.7.3.2.7 Air-to-Air Energy Recovery Systems
D.7.4 Central Plant Systems
D.7.4.1 Water-side Economizers
D.7.4.2 Chillers
D.7.4.3 Boilers
D.7.4.4 Combined Heat and Power
D.7.4.5 Heating Systems
D.7.4.6 Distribution Systems
D.7.4.6.1 Water-side Economizers
D.7.5 Plumbing and Water Use
D.7.5.1 Indoor Plumbing Fixtures
D.7.5.2 Water-Consuming Mechanical Systems
D.7.6 Building Control Systems
D.7.6.1 Guidelines for Designing an EMCS
D.7.7 Electrical Power Systems
D.7.7.1 Uninterruptible Power Supply (UPS) Systems
D.7.7.2 Green Power Procurement
D.7.8 Metering
D.8 LID Site Planning Process
Appendix E
- LEED Checklist
Appendix F
- Landscape Maintenance Schedule
Appendix G
- Prioritized Improvements Projects List
Appendix H
- Self-Help Project Checklist
Appendix I
- Interior Finishes Standards
I.1 Flooring
I.1.1. Carpet
I.1.1.1. Guidance, Warranties, and Requirements
I.1.1.2. Type/Size Requirements
I.1.1.3. Quality Considerations
I.1.1.4. Sustainablility
I.1.1.5. Cushions/Padding
I.1.1.6. Use and Selection
I.1.1.7. Solid Colored Carpet
I.1.1.8. Pattern Selection
I.1.2. Vinyl Composition Tile (VCT)
I.1.2.1. Adhesives
I.1.2.2. Installation
I.1.3. Sheet Vinyl
I.1.4. Porcelain Tile
I.1.4.1. Sizes
I.1.4.2. Finish Texture
I.1.4.3. Meet ADA and OSHA
I.1.4.4. Grout
I.1.5. Wood
I.1.6. Seamless Epoxy
I.1.7. Rubber
I.1.7.1. Basic Type
I.1.7.2. Heavy Duty Type
I.1.8. Stained/Sealed Concrete
I.1.8.1. Chemically Stained or Colored
I.1.8.2. Unfinished (Sealed)
I.2 Base
I.2.1. Rubber
I.2.2. Tile
I.2.3. Wood
I.2.4. Sheet Vinyl
I.2.5. Carpet
I.3 Walls
I.3.1. Paint & Coatings
I.3.1.1. General
I.3.1.2. Gloss Levels
I.3.1.3. Basic Solid Paint
I.3.1.4. Interior Multi-Color Speckled Paint
I.3.1.5. Paint at Barracks
I.3.1.6. Spot Painting
I.3.1.7. Large Scale Painting
I.3.1.8. Authorized Paint Colors
I.3.2. Wallcoverings Paper/Viny
l
I.3.2.1. General
I.3.2.2. Fire Code Requirements
I.3.3. Wallcoverings Fabric/Textile
I.3.4. Acoustical Wall Panel
I.3.5. Wall Tile
I.3.5.1. General
I.3.5.2. Restrooms
I.3.6. Wood Paneling
I.3.7. Stone or Brick
I.4 Ceilings
I.4.1. Gypsum
I.4.2. Suspended Acoustical Tile
I.4.3. Metal or Special Ceilings
I.4.4. Non-Perforated Acoustical Tile
I.4.5. Other
I.5 Countertops
I.5.1. General Cabinet and Countertop Criteria
I.5.2. Material Types Countertops
I.6 Doors
I.6.1. General
I.6.2. Fire Code Requirements
I.6.3. Material Type
I.6.3.1. Wood
I.6.3.2. Metal
I.6.3.3. Hardware
I.7 Lighting
I.7.1. General
I.7.2. Lamp Use Guidance
I.7.3. Incadescent
I.7.4. Fluorescent
I.7.5. Specialty
Appendix J
- Interior Furnishings Standards
J.1 Furniture Finishes
J.1.1 Wood
J.1.2 Metal
J.1.3 Laminate
J.1.4 Glass
J.2 Furniture & Textile Construction
J.2.1 Furniture
J.2.1.1 Wood
J.2.1.2 Metals
J.2.2 Textiles
J.3 Conventional Furniture
J.3.1 Seating
J.3.1.1 Operational Seating
J.3.1.2 Stationary Chairs
J.3.1.3 Lounge Seating
J.3.2 Seating Types
J.3.3 Function
J.3.4 Flexibility
J.3.5 Maintenance
J.3.6 Tables & Countertops
J.3.7 Freestanding Office Furniture Casegoods
J.3.8 Temporary Living Facilities and Dormitories Casegoods
J.3.9 Filing Cabinets
J.4 Systems Furniture
J.4.1 General Office Spaces
J.4.1.1 Secretarial/General Office Worker
J.4.1.2 Supervisor
J.4.1.3 Engineer and Element Chief
J.4.1.4 Group Level Executive Staff
J.4.1.5 Commander
J.4.1.6 Bull Pen and Teaming Arrangements
J.5 Children's Furniture
J.6 Accessories
J.6.1 Artwork & Bulletin Boards
J.6.1.1 Artwork
J.6.1.2 Bulletin Boards
J.7 Restrooms & Locker Rooms
J.8 Signage
J.9 Railings
Appendix K
- Exterior Materials Chart
Administration Facilities Visual Theme
Industrial Facilities Visual Theme
Troop Housing Visual Theme
Gates Visual Theme
Community / Community Support Visual Theme
Recreational Facilities Visual Theme
Appendix L
- Exterior Color Chart
Visual Zone A
Visual Zone B1 (a)
Visual Zone B1 (b)
Visual Zone B2
Visual Zone B3
Visual Zone D1
Visual Zone D2
Visual Zone D3
Visual Zone D4
Visual Zone E
Visual Zone F
Visual Zone G
Appendix M
- Historic Preservation Guidelines
M.1 Introduction
M.1.1 Military Planning and Design
M.2 Historic Preservation Regulations
M.3 Rehabilitation of Historic Proferties
M.3.1 New Work
M.3.2 Treatment of Historic Fabric
M.3.3 Standards for Historic Preservation Projects
M.3.3.1 Compatible Use of Historic Sites and Structures
M.3.3.2 Retention of Character Defining Features
M.3.3.3 Treatment of Deteriorated Historic Fabric
M.3.3.4 Documentation of Missing Historic Elements
M.3.3.5 Retention of Historic Alterations
M.3.3.6 Unacceptable Alterations
M.3.3.7 Acceptable Alterations and Additions
M.3.3.8 Contemporary Design in a Historic Context
M.3.3.9 Surface Cleaning Methods
M.3.3.10 Archaeological Resources
M.3.3.11 Historic Preservation and Maintenance
M.3.4 Guidelines for Historic Preservation Projects
M.3.4.1 Roof Guidelines
M.3.4.2 Wall Guidelines
M.3.4.3 Porch Guidelines
M.3.4.4 Window Guidelines
M.3.4.5 Door Guidelines
M.3.4.6 Color Guidelines
M.3.4.7 Painting Guidelines
M.3.4.8 Handicap and Safety Access Guidelines
M.3.4.9 Mechanical Equipment Guidelines
M.3.4.10 Guidelines for Additions
M.3.4.11 Force Protection
M.4 Army Standards
M.5 References
Appendix N
- Housekeeping Rules
N.1 Housekeeping Rules for ...
N.1.1 General
N.1.2 Public Spaces
Appendix O
- Plant Palette
Appendix P
- DA Facilities Standardization Program Centers Of Standardization
Appendix Q
- Standards & References
Q.1 Section 7, Site Planning
Q.2 Section 8, Buildings
Q.3 Section 9, Circulation
Q.4 Section 10, Landscape
Q.5 Section 11, Site Elements
Q.6 Section 12, Force Protection
Q.7 Appendix D, Sustainable Design
Q.8 Appendix M, Historic Preservation
Acknowledgements